Click to Share
 

SEM PMCONDEG Annual Service / Recertification Package

The complexities of the unit, the best method to maintain the unit is at the factory where special consideration is given to safety and the special measurement tools required to analyze the system.

Manufacturer - SEM
Model # - PMCONDEG
SKU - PMCONDEG
Submitted By - Mono Machines (Retailer, Distributor)
Country - United States
Category - Office : Equipment

Contact   |   Link To Product   |   More Products By This Company

Images

Click on an image to see larger size image ...

sem-pmcondeg-annual-service--recertification-packagelogo

Specifications

Special Info :   NSA Approved
Manuf Part :   PMCONDEG
Manufactured In :   USA
Expected Ship Date :   3-5 Days
Weight :   1

Details

In order to insure maximum operational effectiveness, SEM Degaussers should be maintained on an annual basis. Given the complexities of the unit, the best method to maintain the unit is at the factory where special consideration is given to safety and the special measurement tools required to analyze the system. In addition to the maintenance of the unit, the Service Agreement also includes a recertification test. Using a 5000 oe Hard Disk Drive, SEM will perform this "worst case" test to insure that all devices 5000 Oe and below continue to be degaussed in accordance with the manufacturer’s specifications. The test is performed at the Hard Drive Manufacturing and Development test labs of Fujitsu / Toshiba using highly sensitive, sophisticated measurement instruments designed specifically to measure data on hard disks. How the program works: SEM ships customized degausser crate to customer's dock. Customer packs degausser in crate, then contacts SEM who arranges for pick-up and shipment to SEM facility. SEM performs complete overhaul of the unit, replacing any part that is covered under warranty. If a part is required that is NOT covered under warranty, SEM will contact the customer to discuss repair options. After the unit is serviced, SEM will conduct a recertification test with a 5,000 Oe hdd. Upon completion of recertification test, the degausser is returned to customer's dock. A maintenance report is included. Recertification test results are sent via email.

Tags

, , , , ,


Disclaimer: Submitters of product listings are solely responsible for their content. PRLog can't be held liable for the contents of the product listings.   Report Abuse


Like PRLog?
9K2K1K
Click to Share